Cracked Concrete Floor – Industrial Building, Hungary

Location: Logistics hall in the Győr region
Problem: Concrete floor in the industrial zone deteriorated within one year
Problem: Concrete floor in the industrial zone deteriorated within one year
Analysis: Missing post-treatment and improperly dimensioned expansion joints
Measures: Surface inspection, spot checks using trial milling, and recommendation of a multi-layer composite flooring system
Result: Repair executable within 3 weeks, with a 15-year lifespan – 65% more cost-effective than complete removal and replacement
Measures: Surface inspection, spot checks using trial milling, and recommendation of a multi-layer composite flooring system
Result: Repair executable within 3 weeks, with a 15-year lifespan – 65% more cost-effective than complete removal and replacement