Belgium – Repair of Concrete Defects in a New Building

Location: New office complex near Antwerpen
Problem: Surface cracks and discoloration prior to final handover
Problem: Surface cracks and discoloration prior to final handover
Analysis: Uneven distribution of aggregates and insufficient setting time
Measures: Sample area repair, implementation of a surface protection system, and material replacement
Result: Achieved both aesthetic and technical acceptance prior to handover; project completed 3 weeks ahead of schedule
Measures: Sample area repair, implementation of a surface protection system, and material replacement
Result: Achieved both aesthetic and technical acceptance prior to handover; project completed 3 weeks ahead of schedule